INSTALLATION — REMOVAL · ČSN INSTALLATION · SERVICE

Made to measure. Installed to the millimetre.

The best window does not work without proper installation. Our own team installs to ČSN 74 6077 and RAL principles: three layers in the perimeter joint, precise anchoring, clean reveals. No foam-and-hope.

New window being installed – taped frame, sash open
INSTALLATION — REMOVAL · ČSN INSTALLATION · SERVICE
  • ČSN 74 6077Czech standard for installing windows and doors
  • 3 layersin the perimeter joint: tape, insulation, membrane
  • 1–2 dayswindow replacement in a typical apartment
  • 5 yearswarranty on installation

What we take care of

New window being installed – taped frame, sash open

Removal of old windows

Careful removal of old frames without damaging the reveals, protection of floors and furniture, removal and environmentally sound disposal. New windows go in the same day.

  • Floors and furniture covered
  • Removal without damage to reveals
  • Old windows taken away and disposed of
  • Replacement in a single day
Folding aluminium doors prepared in the workshop

Installation to ČSN 74 6077

Anchoring into the load-bearing structure, vapour-barrier tape on the inside, thermal insulation of the joint, breathable membrane on the outside. Documented, verifiable, covered by warranty.

  • Anchors and frame screws every 700 mm
  • Vapour-barrier and breathable tapes
  • Expanding foam tape or PUR foam for windows
  • Installation report
Detail of black aluminium window frames with frosted glass

Finishing, sills and service

Interior and exterior sills, plastering of reveals, plaster trim beads, hardware adjustment. Service after the first heating season and any time after.

  • Interior and exterior sills
  • Plastering of reveals
  • Hardware adjustment after the first season
  • Service for windows from other suppliers too

Why have us install

01

Our own team, not a subcontractor

OKNA CONCEPT fitters install only our orders. They know the profile, the hardware and what we promised at the survey.

02

The standard, not habit

ČSN 74 6077 prescribes how the perimeter joint must be built. We follow it on every order, whatever the size.

03

One day without windows is too many

We remove and install in a single day. The apartment stays habitable, the house stays closed.

04

Handover report

We check the function of every leaf, brief you on operation and hand over a report with the warranty.

What installation includes

An overview of what is included in the installation price for each option. Prices are indicative for one window of standard size.

Basic installationČSN / RAL installationComplete replacement
Anchoring into the structureyesyesyes
Vapour-barrier and breathable tapesnoyesyes
Thermal insulation of the jointPUR foamPUR foam or expanding foam tapePUR foam or expanding foam tape
Removal and disposal of old windowsnonoyes
Plastering of revealsnonoyes
Interior and exterior sillsnoon requestyes
Indicative price1 500–2 500 CZK per window2 500–4 000 CZK per window4 500–7 500 CZK per window
Detail

The detail decides

Hardware, seals, the glazing spacer and the installation joint: these are where a window shows its quality after 20 years. So we solve them before the price.

Close-up of a dark window handle on a modern window
HARDWARE · HANDLE
Corner of a window with the sky reflected in the glass
GLAZING · WARM EDGE

How installation day goes

  1. 01

    Preparation

    We cover the floors and furniture, disconnect blinds and sills and clear the working area around the windows.

  2. 02

    Removal

    We take out the old frames without damaging the reveals and prepare the opening: cleaning, levelling, priming.

  3. 03

    Installation

    Setting the frame on packers, levelling in all planes, anchoring, tapes, insulation, hanging the leaves.

  4. 04

    Completion

    Sills, finishing, hardware adjustment, clean-up and handover with a report. We brief you on operation and maintenance.

FAQ

Questions about installation

What is installation to ČSN 74 6077?

The Czech standard for installing windows and doors. It prescribes anchoring into the load-bearing structure and three layers in the perimeter joint: vapour-tight inside, insulating in the middle and vapour-open outside. Without it there is a risk of condensation, mould and draughts.

How long does window replacement in an apartment take?

An apartment with 5–8 windows in one working day, including removal and finishing. A family house with 15–25 windows in 2–3 days. An HST door 1–2 days depending on access.

Do I need to be at home during installation?

At the start and at handover, yes. During the day it is enough for the team to have access. At handover we check the function of every leaf together.

Will you install windows I bought elsewhere?

Yes, provided they were measured correctly and match the openings. We check them before installation. We also service hardware and seals on windows from other suppliers.

What about plastering and sills?

Complete replacement includes plastering of the reveals, plaster trim beads and installation of interior and exterior sills. We do not provide painting or final rendering, but we can recommend partners.

What is the warranty on installation?

5 years on installation and products. Adjustment after the first heating season is included. A perimeter joint can be assessed against ČSN 74 6077 in a claim, which is why we follow it.

We will price your project

Send us the dimensions, the number of windows or simply a photo of the opening. Within 24 hours we reply with an indicative price and propose a date for the site survey. Surveys in Prague and the surrounding area are free and without obligation. Consultation in English is available.

We reply within 24 hours. No obligation, no hidden fees.

Attach a photo or drawing

    Call WhatsApp Quote